Ordinary Schedules
Meter assignment is a requirement. In addition to the QC Rules the Ordinary Schedule can have the following associations:
- Charges.
- Payments.
- Penalties.
An Ordinary Schedule should be associated with at least one Zone but can be associated with more than one Zone. Zones determine which Meters can be associated with the Schedule. Only Meters within the associated Zone can be selected for the Schedule. The fact that the Meter is in a Zone, does not mean that the Meter is automatically included in the Schedule. The Meter has to be manually included in the Schedule. Meters can always be added to a Zone, but when added, will only be available for the next Cycle and not the current Cycle.
Comments
0 comments
Please sign in to leave a comment.